Make the data center qualify before it asks the grid to believe it.

GridReady screens large-load projects across six readiness layers, exposes the blockers, and turns a speculative megawatt request into a structured engineering action plan.

PEAK LOAD
500 MW
Requested campus peak
GRID SHARE
30%
150 MW grid import cap
COVERAGE
125%
Grid + generation + BESS + flexible load
BESS DURATION
4.0 h
200 MW / 800 MWh
MAKE-UP WATER
75,000 GPD
85% recycled-water target
Power100
Supply coverage, onsite power, storage and flexibility
Stability30
VRT, dynamic models and disturbance behavior
Water100
Source, reuse, backup and cooling demand
Cooling87
Cooling architecture, WUE and heat reuse
Compliance80
Site, finance, screening and regulatory package
Community70
Noise, emergency traffic and water impact